Figure 3

Hourly traffic counts during the DNC (July 26–29) and during corresponding weekdays before and after the DNC, on the major north-south highways with road closures (I-93 and Route 1) and a loop road without road closures (I-95).
Hourly traffic counts during the DNC (July 26–29) and during corresponding weekdays before and after the DNC, on the major north-south highways with road closures (I-93 and Route 1) and a loop road without road closures (I-95).